電動卷簾門的具體安裝技術要求
電動卷簾門在一定時間內,連同框架能滿足耐火穩定性和完整性要求的卷簾,由簾板、卷軸、電動機、導軌、支架、防護罩和控制機構等組成。具體安裝技術要求如下:
Within a certain period of time, the electric roller shutter, together with the roller shutter whose frame can meet the requirements of fire resistance stability and integrity, is composed of curtain plate, roller, motor, guide rail, bracket, protective cover and control mechanism. The specific installation technical requirements are as follows:
A、導軌:導軌應相互平行、垂直,其平行、垂直度誤差不大于5mm;導軌頂部必須用F形扳手折成圓弧形,固定導軌用膨脹角碼間距應在600mm以內且同一層區域內導軌固定點高度應一致,導軌上端應與支架板下口齊平,距離不大于50mm。
A. Guide rail: the guide rail shall be parallel and vertical to each other, and the error of parallelism and perpendicularity shall not be greater than 5mm; The top of the guide rail must be folded into an arc shape with an F-shaped wrench. The spacing of the expansion angle code used to fix the guide rail should be within 600mm, and the height of the fixed point of the guide rail in the same layer area should be consistent. The upper end of the guide rail should be flush with the lower opening of the support plate, and the distance should not be greater than 50mm.
B、轉軸及支架板:兩端支架板必須在同一水平上且縱向互平行,誤差不得超過5mm,主支架背后支撐不少于兩道,副支架背后必須有支撐以保證轉軸平穩運轉。副板處轉軸軸托必須實焊滿焊。(支架板支撐用角鋼,統一采用5#鍍鋅角鋼)雙簾的兩根轉軸掛鉤螺絲必須調到同一平面上。
B. Rotary shaft and support plate: the support plates at both ends must be at the same level and parallel to each other longitudinally, with an error of no more than 5mm. The back of the main support must have at least two supports, and the back of the auxiliary support must have support to ensure the smooth operation of the rotary shaft. The shaft bracket at the auxiliary plate must be fully welded. (Angle steel is used for support of support plate, and 5 # galvanized angle steel is uniformly used) The two pivot hook screws of double curtain must be adjusted to the same plane.
C、簾面:
濟南電動卷簾門安裝維修人員認為,須用掛鉤片與轉軸連接并擰緊螺母,掛鉤片之間距不大于1000mm,簾面兩端各嵌入導軌深度不小于50mm;底梁與門簾間連接必須牢固靈活,簾面表面必須保持干凈整潔。簾面調試后底梁必須保持水平并平行運行。
C. Curtain surface: Jinan electric roller shutter door installation and maintenance personnel believe that it is necessary to use the hook piece to connect with the rotating shaft and tighten the nut. The distance between the hook pieces is not more than 1000mm, and the depth of the embedded guide rail at both ends of the curtain surface is not less than 50mm; The connection between the sill and the door curtain must be firm and flexible, and the curtain surface must be kept clean and tidy. After curtain commissioning, the sill must be kept horizontal and run in parallel.
D、封堵門楣:固定點必須用膨脹角碼固定,固定點間距≤1000mm,封堵下口必須在軌道上口往下100mm處,兩端必須用4#角鐵與墻面固定,遇到上部有管道、橋架等障礙物穿過處,必須確保密封、平整。封堵整體平面必須要干凈、平整。
D. Blocking the lintel: the fixing point must be fixed with expansion angle code, and the spacing between the fixing points is ≤ 1000mm. The lower opening of the blocking must be 100mm below the upper opening of the track, and both ends must be fixed with 4 # angle iron to the wall. When encountering obstacles such as pipes and bridges passing through the upper part, the sealing and leveling must be ensured. The overall sealing plane must be clean and flat.
E:防火包箱:包箱兩端的支撐架必須采用4#角鐵在地面制作完成,轉角處必須成90度角。中間包箱支架采用2.5角鋼制作,各支架間距不得大于2000mm(寬度再小中間必須加支架)。包箱電機行程檢修口尺寸為寬500mm×300mm(豎向6片活動做成側拉式,上下用2.5角鐵固定當作抽屜式軌道),包箱下平面鏈條檢修口尺寸100mm×88mm(橫向活動式1片,前端與包箱體串接)。包箱整體必須要干凈、平直。
E: Fireproof packing box: the support frame at both ends of the packing box must be fabricated on the ground with 4 # angle iron, and the corner must be at a 90 degree angle. The tundish box support is made of 2.5 angle steel, and the spacing between the supports shall not be greater than 2000mm (if the width is smaller, the support must be added in the middle). The size of the travel access hole of the package motor is 500mm wide × 300mm (6 pieces of vertical movement are made into side pull type, and 2.5 angle iron is used to fix the upper and lower parts as drawer type rail), and the dimension of the plane chain access hole under the package box is 100mm × 88mm (1 piece of horizontal movable type, with the front end connected in series with the package body). The whole package must be clean and straight.
F、電機、控制箱、按鈕盒、熔斷器:
F. Motor, control box, button box, fuse:
①、電機鏈條張緊輪必須安裝且安裝在電機與鏈輪中間的下方。電機強弱電金屬軟管必須分開且整齊連接控制器。
① The chain tensioner of the motor must be installed under the middle of the motor and sprocket. The strong and weak current metal hoses of the motor must be separated and neatly connected to the controller.
②、控制器必須由兩個膨脹螺栓固定牢固,且金屬軟管必須用塑料接頭與控制箱連接。安裝初步調試完畢后隨手把控制箱內的所有電源關閉并鎖門,外觀平直;
② The controller must be fixed firmly by two expansion bolts, and the metal hose must be connected to the control box with plastic connectors. After the installation and preliminary commissioning, turn off all power supplies in the control box and lock the door with a flat and straight appearance;
③、按鈕開關安裝高度必須一致,具體高度1.4米左右,按鈕盒安裝必須用螺絲固定,不能電焊,外觀要保持干凈、整齊、無破損,安裝完畢后統一上鎖,鑰匙統一帶回公司;
③ The installation height of the button switch must be the same, with the specific height of about 1.4 meters. The button box must be fixed with screws instead of electric welding. The appearance should be kept clean, tidy and free of damage. After installation, the key should be locked uniformly and brought back to the company;
④、熔斷器統一安裝于電機側包廂正面的角鋼上同一位置且與角鋼保持平行,熔斷器的鋼絲繩要捋平用塑料扎帶固定,保證不卷入其他部位。
④ The fuse shall be uniformly installed at the same position on the angle steel on the front of the box at the motor side and kept parallel with the angle steel. The wire rope of the fuse shall be smoothed and fixed with plastic ties to ensure that it is not involved in other parts.
電動卷簾門的制作要求較高,即要求整個系統能經受一定時間的1100°左右高溫考驗,電動卷簾門的耐火時間是電動卷簾門的主要指標。更為詳細的內容就來我們網站
//domachine.com.cn咨詢吧!
The manufacturing requirements of the electric rolling shutter door are high, that is, the whole system is required to withstand the high temperature test of about 1100 ° for a certain time. The fire resistance time of the electric rolling shutter door is the main index of the electric rolling shutter door. Come to our website for more details //domachine.com.cn Ask!