能讓卷簾門安裝后更加牢固的方法有哪些

來源://domachine.com.cn/  發布時間:2021-04-07 19:12:37

卷簾門怎么安裝更牢固呢?卷簾門進入國內短短數十年,但得到了很多企業的認可,紛紛開始安裝使用,但是有些偏遠地區需要安裝人員安裝,會產生不少費用,有些客戶會選擇自己安裝來省下這筆費用。那么,卷簾門安裝遵循哪些方法會更加牢固呢?
How can the rolling shutter door be installed more firmly? The rolling shutter door has entered China for just a few decades, but it has been recognized by many enterprises and began to be installed and used one after another. However, some remote areas need installers to install it, which will incur a lot of costs. Some customers will choose to install it themselves to save this cost. So, which methods will be more firm for the installation of rolling shutter door?
卷簾門安裝步驟:
Installation steps of rolling shutter door:
卷簾門由多個部件構成,包括提供動力性能的電機,作為控制系統的電箱,門簾,透明視窗等等。卷簾門的質量除了體現在各部件自身質量外,也體現在安裝。安裝質量高,卷簾門運作能更長久,更平穩,使用過程中能免去很多不必要的麻煩。
The rolling shutter door is composed of several components, including the motor providing power performance, the electric box as the control system, the door curtain, the transparent window and so on. The quality of rolling shutter door is not only reflected in the quality of each component itself, but also reflected in the installation. The installation quality is high, the operation of the rolling shutter door can be longer and more stable, and many unnecessary troubles can be avoided in the process of use.
安裝人員在安裝前需要熟悉卷簾門的安裝圖紙,檢查卷簾門的線路是否到位,并做好其他安裝準備,包括需要用到的零部件,工具等。
Before installation, the installation personnel shall be familiar with the installation drawings of the rolling shutter door, check whether the circuit of the rolling shutter door is in place, and make other installation preparations, including the required parts, tools, etc.
安裝前還需要檢查門的尺寸與洞口尺寸是否相符;導軌支架的數量是否正確;洞口預埋件,支架埋件位置是否正確等等。
Before installation, it is also necessary to check whether the size of the door is consistent with the size of the opening; Whether the number of guide rail supports is correct; Whether the position of embedded parts at the opening and support is correct, etc.
工藝流程大致分為:洞口處理,彈線,固定卷筒傳動裝置,空載試車,裝簾板,安裝導軌,試車,清理。
The process flow is roughly divided into: hole treatment, snapping line, fixing drum drive device, no-load test run, installing curtain plate, installing guide rail, test run and cleaning.
洞口處理:復核洞口與產品尺寸是否相符,一般洞口寬度和高度不宜大于5m,復核預埋件位置和數量。
Hole treatment: recheck whether the hole is consistent with the product size. Generally, the width and height of the hole should not be greater than 5m, and recheck the position and quantity of embedded parts.
彈線:測量洞口標高,彈出兩導軌垂直及卷筒中線。
Snap line: measure the elevation of the opening, and snap the vertical of the two guide rails and the center line of the drum.
固定卷筒傳動裝置:將墊板電焊在預埋鐵板上,用螺絲固定卷筒的左右支架,安裝卷筒,卷筒安裝后應轉動靈活,安裝減速器和傳動系統,安裝電氣控制系統。
Fixed drum driving device: weld the base plate on the embedded iron plate, fix the left and right supports of the drum with screws, install the drum, rotate flexibly after installation, install the reducer and transmission system, and install the electrical control system.
空載試車:通電后檢驗電機,減速器工作情況是否正常,卷筒轉動方向是否正確。
No load test run: after power on, check whether the motor and reducer work normally and whether the rotation direction of the drum is correct.
裝簾板:將簾板拼裝起來,然后安裝在卷筒上。
Install the curtain plate: assemble the curtain plate and install it on the drum.
安裝導軌:按圖紙規定位置,將兩側及上方導軌焊牢于墻體預埋件上,并焊成一體,各導軌應在同一垂直平面上。
Installation of guide rail: according to the position specified in the drawing, the guide rails on both sides and above shall be welded firmly on the embedded parts of the wall and welded into a whole. Each guide rail shall be on the same vertical plane.
試車:先手動試運行,在用電機啟閉數次,調整無卡住,阻滯及異常噪音等現象為止,啟閉的速度符合要求。全部調試完畢,安裝防護罩。
Test run: start the test run manually, open and close the motor for several times, and adjust it until there is no jamming, blocking and abnormal noise. The opening and closing speed meets the requirements. After all commissioning, install the protective cover.
清理:粉刷或鑲砌導軌墻體裝飾面層,清理現場。
Cleaning: paint or inlay the decorative surface of the guide rail wall, and clean the site.
以上就是為大家介紹的有關濟南電動卷簾門安裝維修的詳細介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯系我們.我們將以的態度,為您提供服務//domachine.com.cn
The above is a detailed introduction about the installation and maintenance of Jinan electric rolling shutter door. I hope it will help you If you have any questions, please contact us We will provide you with professional service //domachine.com.cn