防火卷簾門安裝防火卷軸的過程
防火卷簾門安裝防火卷軸的過程您了解嗎?這在安裝該門的期間一定要做好的一個過程,不然后期進行使用非常容易出現問題,下面
濟南防火卷簾門安裝維修人員為您講解。
Do you know the process of installing fire reel for fire shutter door? This is a process that must be done well during the installation of the door, otherwise it is very easy to have problems in later use. Now, the installation and maintenance personnel of Jinan fireproof rolling shutter door will explain it to you.
1、依據大樣圖中卷軸的設計中心高度,在立柱或墻上定出主動支承板的中心位置,放出膨脹螺栓的中心十字線。
1. According to the design center height of the reel in the detail drawing, determine the center position of the active support plate on the column or wall, and set out the center cross line of the expansion bolt.
2、以主支承板中心為基準,用水平塑料管找出對應的從動支承板中心和從動膨脹螺栓孔十字線。
2. With the center of the main support plate as the benchmark, use a horizontal plastic pipe to find out the corresponding center of the driven support plate and the cross line of the driven expansion bolt hole.
3、打孔:用沖擊鉆打膨脹孔要求鉆頭垂直于柱面,若個別螺孔碰鋼筋,鉆不進則可適當移動,但不能影響牢固和外觀。
3. Hole drilling: when drilling expansion holes with impact drill, the drill bit shall be perpendicular to the cylinder surface. If individual screw holes collide with steel bars and cannot be drilled, they can be moved appropriately, but the firmness and appearance cannot be affected.
4、安裝支承扳:
4. Install the support plate:
(1)裝主動支承板(驅動機支架事先連接,焊接在支承板上),用螺母,彈簧墊圈,平墊圈把穿過支承扳孔的膨脹栓旋緊,要求支承板面垂直于卷軸。
(1) Install the active support plate (the support of the driver is connected in advance and welded on the support plate), and tighten the expansion bolt through the support plate hole with nuts, spring washers and flat washers. The support plate surface is required to be perpendicular to the reel.
(2)裝動承板方向同上,但在緊螺栓前,要求水平管校核從動支承板的中心高度是否與主動支承板一致,水平度控制在洞口高度的1/300內,如有偏差及時調整。
(2) The installation direction of the moving bearing plate is the same as above, but before tightening the bolts, the horizontal pipe is required to check whether the center height of the driven bearing plate is consistent with that of the active bearing plate, and the levelness is controlled within 1/300 of the opening height. If there is any deviation, it shall be adjusted in time.
(3)支承板隨整扇門的重量,有些支承板雖有膨脹栓固定,但還不夠穩固,則應補以支撐或加強筋,現場固定、配焊、磚墻上固定支承板用對穿栓。
(3) The bearing plate shall follow the weight of the whole door. Although some bearing plates are fixed with expansion bolts, but they are not stable enough, they shall be supplemented with support or reinforcement. The bearing plates shall be fixed on the site, welded together, and fixed on the brick wall with through bolts.
5、安裝卷軸
5. Install the reel
(1)卷軸安裝前,先將掛板定好方向裝到卷軸上,再把4-6片簾板裝到掛板上并卷緊在卷軸上鐵絲扎牢。
(1) Before the installation of the reel, fix the direction of the hanging plate and install it on the reel, then install 4-6 curtain plates on the hanging plate and tighten them on the reel and fasten them with iron wires.
(2)吊裝卷軸,一定要注意,設專人指揮、人字梯、腳手架、手拉葫蘆都要經過檢查。安裝時先將套上軸承及座的光軸塞入卷軸端孔中,對準位置后將軸承固定螺栓擰緊。
(2) Pay attention to safety when hoisting reels. Assign special personnel to command, and check the herringbone ladder, scaffold and chain block. During installation, insert the smooth shaft of the sleeve bearing and seat into the end hole of the reel, align the position, and then tighten the bearing fixing bolts.
(3)卷軸上好后,可左右移動卷筒調節位置。同時用水平尺和水平管復核一下卷軸的水平。調整好后,光軸與卷軸滿焊固定,光軸與軸承用支頭螺釘固定。
(3) After the reel is installed, the reel can be moved left and right to adjust the position. At the same time, recheck the level of the reel with a level ruler and a horizontal tube. After adjustment, the smooth shaft and the reel shall be fully welded and fixed, and the smooth shaft and the bearing shall be fixed with the supporting screws.
(4)卷軸吊裝時要特別注意不要碰壞卷在軸上的簾板,用鋼絲繩捆扎時要墊木板。
(4) Pay special attention not to damage the curtain plate rolled on the shaft when hoisting the reel, and pad the board when binding with steel wire rope.
防火卷簾門安裝防火卷軸的過程的相關內容講解完畢了,我們從五個步驟來了解起來,當然您要注意其中的操作細節,正確才是關鍵!關注我們網站
//domachine.com.cn了解更多事項!
The relevant contents of the process of installing the fire reel for the fire shutter door have been explained. We understand it from five steps. Of course, you should pay attention to the operation details. Correct is the key! Follow our website //domachine.com.cn Learn more!