濟南卷簾門安裝施工工藝詳解

來源://domachine.com.cn/  發布時間:2023-09-21 10:04:01

  電(dian)動卷簾(lian)門安(an)裝(zhuang)方法和步驟:

  Installation method and steps for electric rolling shutter door:

  1、先在(zai)需要(yao)安裝的(de)門(men)(men)框框口位置畫出線。表明(ming)尺(chi)寸大小,然后(hou)找工作人(ren)員(yuan)設(she)計出合適的(de)電動卷簾門(men)(men),這里值得注意(yi)的(de)一點(dian)(dian)是框內(nei)高(gao)度比門(men)(men)扇的(de)高(gao)度要(yao)高(gao)一點(dian)(dian)點(dian)(dian)。

  1. First, draw a line at the position of the door frame opening that needs to be installed. Please indicate the size and ask the staff to design a suitable electric rolling shutter door. It is worth noting that the height inside the frame is slightly higher than the height of the door leaf.20210319023536685

  2、先把電動卷(juan)簾(lian)門(men)的(de)門(men)框固定(ding),這里要(yao)先拆掉門(men)框下部的(de)固定(ding)板。(注(zhu)意:洞口兩(liang)側地面(mian)要(yao)預(yu)留凹槽,經校正(zheng)合格(ge)后,固定(ding)木楔,門(men)框鐵腳與(yu)預(yu)埋鐵板件(jian)焊牢。用水泥砂(sha)漿或(huo)強(qiang)度(du)不低于(yu)10MPa細石(shi)混凝土嵌(qian)塞(sai)牢固即可。)

  2. First, fix the door frame of the electric rolling shutter door. Here, you need to remove the fixing plate at the bottom of the door frame. (Note: grooves should be reserved on both sides of the entrance, and after being calibrated and qualified, wooden wedges should be fixed. The door frame iron feet should be welded firmly to the embedded iron plate parts. Cement mortar or fine stone concrete with a strength of not less than 10MPa can be used to embed them firmly.)

  3、安裝(zhuang)電(dian)(dian)動卷(juan)簾(lian)門扇(shan)主體(ti)(ti)門扇(shan)。一(yi)定要保證電(dian)(dian)動卷(juan)簾(lian)門與(yu)墻(qiang)體(ti)(ti)結成整(zheng)體(ti)(ti),封閉性要做(zuo)好,再粉刷洞(dong)口及(ji)墻(qiang)體(ti)(ti)。粉刷完畢后,門縫應(ying)均勻(yun)平整(zheng),開啟電(dian)(dian)動卷(juan)簾(lian)門應(ying)該自由輕便,不得有過(guo)緊(jin)、過(guo)松(song)和反(fan)彈現象。防火卷(juan)簾(lian)門安裝(zhuang)方法和步驟(zou):

  3. Install the main body of the electric rolling shutter door leaf. It is necessary to ensure that the electric rolling shutter door is integrated with the wall, with good sealing, and then paint the opening and wall. After painting, the door gap should be even and smooth, and the electric rolling shutter door should be free and easy to open, without being too tight, too loose, or bouncing. Installation method and steps for fireproof rolling shutter door:

  1、按設計型號,查閱產品說(shuo)明書和電氣原理(li)圖(tu)。檢查產品表面處理(li)和零附件(jian)。量測(ce)產品各部(bu)位基本尺(chi)寸(cun)(cun)。檢查門(men)洞口是(shi)否與卷簾(lian)門(men)尺(chi)寸(cun)(cun)相符(fu);導軌、支架的(de)預(yu)埋件(jian)位置、數量是(shi)否正(zheng)確。

  1. Refer to the product manual and electrical schematic diagram according to the design model. Check the surface treatment and accessories of the product. Measure the basic dimensions of each part of the product. Check if the door opening matches the size of the rolling shutter door; Are the positions and quantities of pre embedded parts for guide rails and brackets correct.

  2、測量(liang)洞(dong)口標高,彈出兩導軌垂線(xian)及(ji)卷筒中心線(xian)。

  2. Measure the elevation of the opening and mark the vertical lines of the two guide rails and the centerline of the drum.

  3、將墊板電焊在預埋(mai)鐵板上,用螺絲固定(ding)卷(juan)筒(tong)的左右支架,安裝(zhuang)卷(juan)筒(tong)。卷(juan)筒(tong)安裝(zhuang)后應轉動靈(ling)活。

  3. Weld the pad onto the pre embedded iron plate, fix the left and right brackets of the drum with screws, and install the drum. The drum should rotate flexibly after installation.

  4、安裝減速器和傳動系統。

  4. Install the reducer and transmission system.

  5、安(an)裳電氣(qi)拴街系統。

  5. Anshang Electric Street Tying System.

  6、空載試車。

  6. Empty load test drive.

  7、將(jiang)事先裝配好的簾板安裝在(zai)卷筒上。

  7. Install the pre assembled curtain onto the drum.

  8、安裝導軌(gui)。按圖紙規定位置,將兩側及上方導軌(gui)焊牢于墻體預埋(mai)件上,并焊成以體,各導軌(gui)應在(zai)同一垂直平面上。

  8. Install the guide rail. Weld the two sides and upper guide rails firmly onto the embedded parts of the wall according to the specified position on the drawing, and weld them into a body. Each guide rail should be on the same vertical plane.

  9、安裝水幕噴淋系統(tong),并(bing)與總控制系統(tong)連(lian)接。

  9. Install a water curtain sprinkler system and connect it to the main control system.

  10、試車。先用(yong)手(shou)去(qu)試運行,再(zai)用(yong)電動機啟閉(bi)數(shu)次,調(diao)整無卡(ka)住、阻滯(zhi)及異常。

  10. Test drive. First, try running it by hand, then use the electric motor to open and close several times, adjusting until there is no jamming, blockage, or abnormality.

  自動門(men)水晶卷簾門(men)安裝方(fang)法和步驟(zou)

  Installation method and steps for automatic door crystal roller shutter door

  1、看手動(dong)鏈條是(shi)否(fou)向下,在(zai)將電機固(gu)定(ding)在(zai)主板(ban)上,在(zai)把鏈條固(gu)定(ding)在(zai)輪盤和電機底座齒輪連接(一定(ding)上緊)在(zai)將遙控(kong)接線盒與電機連接,試下手柄(bing)是(shi)否(fou)顛(dian)倒,如顛(dian)倒遙控(kong)接收盒側方有黑色(se)按(an)鍵,向另一方撥動(dong)助(zhu)即可。

  1. Firstly, check if the manual chain is down. Fix the motor on the motherboard, connect the chain to the wheel and motor base gear (make sure to tighten it), and connect the remote control junction box to the motor. Try to reverse the handle. If the remote control receiver box is reversed, there is a black button on the side, and turn it to the other side to assist.

  2、用(yong)尺子量(liang)主板和(he)副板的(de)(de)外邊看下尺寸是否正確(que),如正確(que)把(ba)軸(zhou)上(shang)在側板上(shang),注意要(yao)先把(ba)軸(zhou)打一條水平(ping)線,再(zai)用(yong)10個鉆頭打孔(kong)50公分,1個一定要(yao)直(zhi),再(zai)用(yong)14的(de)(de)鏍母焊(han)在軸(zhou)上(shang),記住要(yao)與軸(zhou)上(shang)的(de)(de)孔(kong)垂(chui)直(zhi)在焊(han),一定要(yao)焊(han)牢固,再(zai)把(ba)簾(lian)子的(de)(de)片的(de)(de)中心與軸(zhou)上(shang)的(de)(de)孔(kong)對齊用(yong)10個的(de)(de)鉆頭打孔(kong)一定要(yao)垂(chui)直(zhi)(也可以用(yong)快絲固定)。

  2. Measure the outer edges of the main and auxiliary boards with a ruler to see if the dimensions are correct. If the axis is correctly placed on the side board, make sure to first draw a horizontal line on the axis, then use 10 drill bits to drill a hole of 50cm, one of which must be straight, and then weld it to the axis with a 14 screw nut. Remember to weld it perpendicular to the hole on the axis, and make sure to weld it firmly. Then align the center of the first piece of the curtain with the hole on the axis and drill it vertically with 10 drill bits (or fix it with a quick wire).

  3、在將卷簾門簾片穿好(hao)兩(liang)側(ce)用封頭封好(hao)用拉(la)鉚釘拉(la)住(記住開始封各一片封一個)。

  3. After threading the rolling shutter door curtain, seal both sides with sealing heads and pull them with rivets (remember to start sealing one piece each).

  4、封完后用繩(sheng)翻過軸(zhou)把(ba)(ba)簾(lian)子(zi)打(da)個(ge)(ge)孔一(yi)(yi)頭一(yi)(yi)個(ge)(ge)用繩(sheng)拴住,別一(yi)(yi)端用人拽住,按下手柄的上(shang)升(sheng)鍵,使軸(zhou)運行(xing)將簾(lian)子(zi)帶上(shang)去(qu),鏍絲桿把(ba)(ba)簾(lian)子(zi)和軸(zhou)連(lian)在(zai)一(yi)(yi)起(水平(ping)要擰(ning)緊(jin)加墊)再把(ba)(ba)簾(lian)子(zi)升(sheng)上(shang)去(qu),一(yi)(yi)定要牢(lao)固。

  4. After sealing, use a rope to flip over the shaft and make a hole in the curtain. Tie one end with a rope, and hold the other end with a person. Press the up button on the handle to make the shaft run and bring the curtain up. Connect the curtain and shaft together with a screw rod (tighten and pad horizontally), and then lift the curtain up firmly.

  5、把軌道的一端開成人字口。

  5. Open one end of the track into a human mouth.

  6、把卷簾(lian)門簾(lian)子調平,上下線定位,左(zuo)邊滑(hua)輪是上限位,右邊是下限位,(根(gen)據現(xian)場(chang)需(xu)要(yao)自行(xing)調節(jie))。

  6. Level the curtain of the rolling shutter door, position the upper and lower lines, with the left pulley at the upper limit and the right pulley at the lower limit (adjust according to on-site needs).