電動卷簾門要確認哪些事項?
準備安裝工具。作業人員準備好電焊機、電錘、手電鉆、梯子、鉆頭、切頭、水平尺、螺絲刀等工具和配件。
Prepare installation tools. Operators should prepare tools and accessories such as welding machines, hammers, electric drills, ladders, drill bits, cutting heads, leveling rods, screwdrivers, etc.
確定電動卷簾門安裝尺寸大小。作業人員在門框的位置畫出線條,確定好電動卷簾門的大小,然后,讓施工人員定做出合適尺寸的電動卷簾門,通常,電動卷簾門的高度要略高于門框。
Determine the installation size of the electric roller shutter door. The operator draws lines at the position of the door frame, determines the size of the electric rolling shutter door, and then has the construction personnel make a suitable size electric rolling shutter door. Generally, the height of the electric rolling shutter door should be slightly higher than the door frame.
確定水平線,根據現場情況來設定尺寸。作業人員在卷簾門側板的洞口上方50厘米處,使用水平尺畫出一條水平線;然后,在卷簾門的側板跨出洞口13厘米處,使用水平尺畫下一條垂直線;再把副板跨出門框的9厘米處,畫出一條垂直線;將側板固定在垂直線上,將側板的處畫上一條水平線。
Determine the horizontal line and set the size based on the on-site situation. The operator draws a horizontal line 50 centimeters above the opening of the side panel of the rolling shutter door using a level ruler; Then, use a horizontal ruler to draw a vertical line 13 centimeters above the opening on the side panel of the roller shutter door; Step the secondary panel 9 centimeters out of the door frame and draw a vertical line; Fix the side panel on a vertical line and draw a horizontal line at the highest point of the side panel.
作業人員將電機固定在主板上,再使用鏈條將輪盤和電機底座連接,把遙控線盒裝置和電機相連接,測試卷簾門的手柄是否顛倒,如果電動卷簾門的遙控接收盒顛倒,則需要撥動內置的黑色按鍵。
The operator fixes the motor on the motherboard, then uses a chain to connect the wheel and motor base, connects the remote control cable box device to the motor, and tests whether the handle of the roller shutter door is reversed. If the remote control receiver box of the electric roller shutter door is reversed, the built-in black button needs to be moved.
電動卷簾門焊接牢固。電動卷簾門確定尺寸合適之后,將其與轉軸焊接牢固,讓焊接的鉆頭打孔保持垂直。作業人員檢查電動卷簾門的電源工作是否正常,將卷簾門的軌道拉成人字,將卷簾門調成水平,確定上下水平線位置準確,再使用螺絲桿將簾子升上去。
The electric roller shutter door is firmly welded. After determining the appropriate size of the electric roller shutter door, weld it firmly with the rotating shaft to ensure that the welded drill bit is drilled vertically. The operator checks whether the power supply of the electric roller shutter door is working properly, pulls the track of the roller shutter door into a straight line, adjusts the roller shutter door to a horizontal position, determines the accurate position of the upper and lower horizontal lines, and then uses a screw rod to lift the curtain up.
第六步:檢查與測試。作業人員打開電源之后,拉動電動卷簾門的開關,進行升降演示操作,確保其不會出現失靈等情況,從而造成事故的發生。作業人員確定電動卷簾門的軌道通暢、潔凈,按鈕不會出現反彈失靈等問題。
Step 6: Inspection and testing. After turning on the power, the operator pulls the switch of the electric roller shutter door to perform a lifting demonstration operation, ensuring that it does not malfunction or cause safety accidents. The operator confirms that the track of the electric roller shutter door is unobstructed and clean, and the buttons will not rebound or malfunction.
The exciting content of this article is provided by the installation and maintenance knowledge of Jinan electric roller shutter doors. There are also many exciting content on this website, and you can click to enter more content: //domachine.com.cn We have dedicated customer service to answer your questions