關于控制箱的調試,鋼制防火卷簾門廠家介紹如下:
1、鋼制防火卷簾門廠家介紹到進行防火卷簾控制器通電功能測試時,需將防火卷簾控制器分別與消防控制室的火災報警控制器或消防聯動控制設備、相關的火災探測器、卷門機等連接并通電,這時防火卷簾控制器應處于正常工作狀態。
1. The manufacturer of steel fire shutter introduces that when the fire shutter controller is powered on, it is necessary to connect the fire shutter controller with the fire alarm controller or fire linkage control equipment in the fire control room, relevant fire detector, door rolling machine, etc. and power on. At this time, the fire shutter controller should be in normal working state.
2、手動控制防火卷簾門上行、下行、停止及行程開關的調整;在無火警的情況下,按一下“上行”按鈕,卷簾門應上行;按一下“下行”按鈕,卷簾門應下行;按一下“停止”按鈕,卷簾門應停止運行。試運行時,有可能上、下不符,此時只需任意調換兩根起閉機的三相接線即可。隨后調試相應運行方向的限位是否起作用,不起作用時應調換限位接線;接著調整好行程開關位置,使防火卷簾開閉到位。
2. Manually control the adjustment of up, down, stop and travel switch of fire shutter door; in case of no fire, press the "up" button, the shutter door shall go up; press the "down" button, the shutter door shall go down; press the "stop" button, the shutter door shall stop running. During the trial operation, it is possible that the upper and lower parts are inconsistent. At this time, it is only necessary to arbitrarily change the three-phase wiring of the two hoists. Then the position of the corresponding running direction is adjusted, and the limit wiring should be replaced when the effect is not effective. Then the position of the travel switch is adjusted to make the fire shutter open and close.
3、接通電源查看“相序/缺相”指示燈是否亮,若燈這應調換電源進線中任意兩相,或檢醒是否缺相。
3. Turn on the power supply to check whether the "phase sequence / missing phase" indicator is on. If the indicator is on, any two phases in the power supply incoming line should be replaced or the phase missing should be detected.
4、鋼制防火卷簾門廠家告訴大家控制箱基本功能正常后,將門關下限位觀察主板上的綠色指示燈是否亮。若指示燈亮,則可進入電腦記憶調試;若指示燈不亮,則應將上限位和下限位控制線、上行鍵和下行鍵控制線以及電機線的任意兩條三相線同時對調,直門歸下限位時主板的綠色指示燈亮。
4. Steel fire shutter door manufacturers tell you that after the basic function of the control box is normal, close the door to the lower limit and observe whether the green indicator light on the main board is on. If the indicator light is on, you can enter the computer memory debugging; if the indicator light is not on, you should switch the upper limit and lower limit control lines, up key and down key control lines and any two three-phase lines of the motor line at the same time until the green indicator light of the main board is on when the door is at the lower limit.
本文來自:濟南電動卷簾門安裝維修更多的內容請點擊://domachine.com.cn 我們將會為您提問的問題提供一個滿意的服務,歡迎您的來電!
This article comes from: installation and maintenance of Jinan electric rolling shutter door. For more information, please click: //domachine.com.cn We will provide a satisfactory service for your questions, welcome your call